Free procurement tool
Procurement savings calculator.
Size the procurement cost reduction available to you: estimate the annual price and process savings from moving more spend onto contract and making purchase orders cheaper to process. Driven entirely by your own numbers, with the formula in plain sight.
The calculator
Estimate your procurement savings.
Enter your own figures. Results update as you type and are shown in rupees, lakh and crore.
Runs entirely in your browser. Nothing you type is sent to ProcEaze or anyone else.
Your numbers
Example values, replace with your own. The figures below are neutral examples to show how the calculator works. They are not benchmarks or ProcEaze results.
₹5,00,00,000 (₹5 crore)
Spend bought at contracted (ARC) rates as a share of the total.
The share you aim to buy on contract.
How much lower contract prices are, as a % of the off-contract price, on average.
Number of POs raised for this spend.
Current process cost: 2,000 POs × ₹1,500 = ₹30,00,000 a year.
Your own estimate of how much the cost per PO could fall.
Estimated annual savings
₹16.5 lakh
₹16,50,000
Price savings
₹7.5 lakh
₹7,50,000
Process savings
₹9 lakh
₹9,00,000
How it is calculated
- Spend moved onto contract = annual spend × (target share − current share)
- ₹5,00,00,000 × (70% − 40%) = ₹1,50,00,000
- Price savings = spend moved onto contract × price difference
- ₹1,50,00,000 × 5% = ₹7,50,000
- Process savings = POs per year × process cost per PO × expected reduction
- 2,000 POs × ₹1,500 × 30% = ₹9,00,000
- Total = price savings + process savings
- ₹7,50,000 + ₹9,00,000 = ₹16,50,000
This is an estimate, not a forecast. It is calculated only from the numbers and assumptions you enter. Actual results depend on your items, suppliers, prices and processes.
The formula
The calculator estimates two separate effects and adds them together.
- Price savings = annual spend × (target share on contract − current share on contract) × price difference. The price difference is how much lower contract prices are, as a percentage of the off-contract price.
- Process savings = purchase orders per year × process cost per PO × expected reduction in process cost.
- Total = price savings + process savings.
If the target share is lower than the current share, price savings are taken as zero. Percentages above 100 are capped at 100.
Getting realistic inputs
Spend and contract share: take the last 12 months of indirect and MRO purchases from your ERP or purchase register, and the part bought at contracted rates.
Price difference: compare off-contract purchase prices with the contract rate for the same items, and use a spend-weighted average rather than the best example.
Process cost per PO: estimate the time requesters, buyers, approvers and accounts spend per order, multiplied by their cost per hour. Be conservative about the reduction you expect.
Tips
Using the estimate well.
- Run it three times: cautious, expected and optimistic assumptions. Present the range, not one number.
- Only count spend that can realistically go on contract. One-off and specialised items often cannot.
- Process savings are usually time freed up, not cash, unless headcount or overtime actually changes.
- Write your assumptions next to the result when you share it, so others can challenge them.
Do this inside ProcEaze
See your actual spend, not just an estimate.
ProcEaze gives role-based dashboards and spend analytics across your purchases, and loads your ARC prices so they are locked at the point of order.
FAQ
Frequently asked questions
It estimates two kinds of savings. Price savings: the extra spend you move onto contract, multiplied by how much cheaper contract prices are. Process savings: the number of POs, multiplied by the process cost per PO and by the reduction you expect. The total is the sum of the two. Every formula is shown with your numbers.
Annual spend and the share on contract come from your ERP or purchase register. The price difference comes from comparing what you paid off contract with the contract rate for the same items. Process cost per PO is usually estimated from the time people spend on requisitions, approvals and POs.
No. They are neutral example values to show how the calculator works. They are not industry figures and not ProcEaze results. Replace them with your own.
Because it depends entirely on your assumptions, and real savings depend on which items move onto contract, supplier pricing, demand, and how processes actually change. Use it to size an opportunity, not as a forecast.
It does not include savings from renegotiating existing contracts, competitive bidding, demand reduction, inventory or working-capital effects, or the cost of making the change. Consider those separately.